In this issue of our newsletter we're focusing on a project we recently delivered for a London-based film studio.

We were approached by the owner of the company who had been advised that it would take eight years to get power to the brownfield site allocated for new film production facilities.

 
 
 

"The £4m installation will deliver annual cost savings of £2m."

 
 
 

Our proposed solution, designed to meet the company’s current and future energy needs, was delivered within six months.

The installation comprises 10 in-line 260kW combined heat and power systems, producing a total of 2.6MW, which are connected to a 1.2MW battery storage unit providing instant on-demand power.

This is a perfect example of the products and services we provide. Without a CHP system the client would not have been able to develop his business on this site.

 
 

Our bespoke designed combined heat and power systems offer our clients ultimately flexibility, which can be expanded as needed; they offer significant annual cost savings and there are on-going reductions in CO2 emissions, which will help to meet net zero obligations.

There are dozens of development sites across the UK that are ideal for a range of industrial applications, but in many cases there is no grid electricity or a gas supply, or the local grid cannot cope. 

CHPs provide the answer for the production of sustainable, reliable and very cost effective energy,

I would be pleased to answer any questions and I can also provide testimonials from some of our recent clients.

Thank you for your time.

Joe Anwyl
CEO
Levercor Energy Systems
Unit 1 Highgrounds Road
Worksop S80 3AT

T: 01909 269947
E: Send an email to Joe
W: Visit website 

 
   
  
 
 
 
 
 
 

You are receiving this email on the basis of Legitimate Interests under GDPR
Opt out of future emails: Unsubscribe